1. <address id="urrux"></address>
        1. Service Hotline:0755-23468502 / 27155162
          What's the matter with the disconnection of automatic winding machine?
          Release time:2021-11-12
          1. Hardware problems: typical problems are the tension and induction of the tensioner. The tension setting of the tensioner is unreasonable, there are burrs at the place where the wire passes, and the lubrication is not enough to jam the wire, resulting in wire breakage.  
           
          2. Parameter setting: this situation is common for novice operators. After the automatic winding machine leaves the factory, the master will generally come to the door for installation and commissioning until the machine runs normally and stably, which shows that there is no problem with the parameters. If the operator doesn't pay attention and changes the parameters, such as speed and wire diameter, fast speed will easily lead to wire breakage. Of course, some bosses think the speed is slow and try to speed up debugging. Generally speaking, the manufacturer has reserved a certain speed, adding some is no problem, but if you add too much, it will cause wire breakage or even more serious problems. Moreover, the tension and tension are not set according to the tension corresponding table, which will also lead to wire breakage. In other words, the customer is required to operate and set according to the safety operation procedures of the full-automatic winding machine. If you don't understand, don't modify the parameter content without authorization, so as to avoid the loss outweighing the gain.  
           
          3. Material reason: the material is mainly the problem of wire rod. In addition to the poor quality of wire rod itself, sometimes it is not noticed. Small wire diameter is used as large wire diameter, which will lead to poor tensile capacity and wire breakage. The former needs to go to the purchasing department for solution, and the latter mainly selects the appropriate wire diameter according to the commissioning requirements.
          Back to previous page
          Contact Us

          Shenzhen Huaguan Intelligent Equipment Co., Ltd.

          Add:Floor 1-3, Building 3, Maibaole Industrial Park, No. 142, Jiangshi Road, Gongming, Guangming New District, Shenzhen, Guangdong Province

          Tel: 0755-23468502 / 27155162

          Fax:0755-23468509

          E-mail:ygjsxw@126com

          E-mail: hg02@ygjsxw.com

          Website: www.parklanesquare.com


          Service hotline
          0755-23468502
          0755-27155162
          Copyright ?  2018 Shenzhen Huaguan Intelligent Equipment Co., Ltd. All Rights Reserved.粵ICP備18136433號
          98久精品国产精品观看无码,91久久中文精品无码中文字幕,国产日韩精品无码去免费专区国产,日日摸夜夜添夜夜添97
          1. <address id="urrux"></address>
              1. 亚洲人成在线不卡网 | 中文字幕精品亚洲无线码二区 | 欧美国产亚洲日韩在线二区 | 亚洲午夜福利在线网 | 日韩精品亚洲日韩精品一区 | 亚洲中文字幕一区二区 |